Appendix Ie: Detailed Business Case Consultation Report

Search in document library
Appendix Ie: Detailed Business Case Consultation Report preview
  • Published Date Thu 21 Sept 2017
All Tags
  • Document topic Resource consent
  • Document category Resource consents

This document contains developed options for a shared path that considered a variety of options; including options that limited the lengths of replacement of the existing seawall. 

Updated 17 March 2022 at 14:15