Waiwhetu Stream Remediation Project: Final Report

Search in document library
  • Published Date Thu 12 Aug 2010
All Tags
  • Document topic Hutt River - Te Awa Kairangi

This report summarises the remediation work carried out on
the lower reaches of the Waiwhetu Stream, between Bell
Road and Port Road Bridge (the "U-channel"), including the
salt marsh located downstream of the Seaview Road Bridge.
This process involves the widening and deepening of the
stream.
Updated 7 December 2022 at 02:00